Projects

Repowering the
Stony Brook Power Plant

The Project

To repower the current simple cycle co-generation Stony Brook Power Plant into a combined cycle.

Schematic

The schematic of the repowered combined cycle power plant.

Matlab flow schematic
T-S Diagram

The T-S diagram for the plant in the schematic above was drawn.

The steam turbine inlet pressure was 2680 psi.
The reheat pressure was 670 psi.
The feedwater heater inlet pressure was 233 psi.
The condenser inlet pressure was 1 psi.

T-S Diagram
Calculations

The Stony Brook Power Plant is a co-generation power plant, meaning that it generates both heat and steam. The summer season however does not require heating, and therefore the process of sending heat to the campus was only calculated for the winter.


Winter Heat Calculations

During the winter, some of the steam generated by the heat recovery steam generator is sent to the campus to obtain the following heat distributions:

Winter heat calculations

Summer Heat Calculations

Since during the summer season, the campus does not require heat, all of the steam generated by the heat recovery steam generator could be sent to the steam turbine. However, since there is an excess, some of that heat could be used for additional loads outside the scope of our projects if necessary.

Summer Heat Calculations

Cycle Efficiency

The cycle efficiency was determined:

Cycle Efficiency

Environmental Impact Statement

The level of CO in our design was 10 ppm as obtained from the technical specifications. The level of NOx in our design was 25 ppm similarly. Since these were both very high values, they had to be reduced to acceptable levels of 0.1 ppm CO and 5 ppm NOx. We did that using CO and SCR catalysts placed inside our HRSG.


CO Reduction NOx Reduction


HRSG Reduction


We have concluded that we could get rid of the Port Jefferson Generating Station nearby because we generate excess energy at a higher efficiency. This allows us to have a single fuel-efficient and low emission power plant rather than two less efficient high emission plants.


Getting rid of Port Jefferson

Conclusion

We have concluded that we will have a surplus of 926 MW and an efficiency 16% higher than that of Port Jefferson Generating Station.